• HOME
  • HOMEOWNERS ▼
    • HOMEOWNER BASICS
    • HOMEOWNER BENEFITS
    • HOMEOWNER PHOTO GALLERY
    • GREEN INFO
    • SALES REP LOCATOR
  • PRODUCTS ▼
    • Xi+
    • Xi
    • PRODUCT MANUFACTURING
    • BASIC SITE PREPARATION
    • STANDARD FEATURES
  • BUILDERS ▼
    • BUILDER BASICS
    • BENEFITS
    • ARCHITECTS
    • CODES
      • CODE REPORTS & CHECKLIST
      • CODE INSPECTOR CHECKLIST
    • WALL DESIGN SPECS
    • PHOTO GALLERY
    • GREEN INFO
    • SALES REP LOCATOR
    • ASSOCIATIONS
  • PUBLICATIONS
  • NEWS
  • SHOWS
  • PHOTO GALLERY
  • FAQ
  • CONTACT US
    • SALES REP LOCATOR
  • ABOUT US ▼
    • ASSOCIATIONS
    • LOCATION
    • HISTORY

  How soon can we backfill after the walls are installed?

You can begin backfilling as soon as the floor is poured and the sub floor is properly attached to the top of the wall.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Map | Privacy Statement

Copyright © 2012 Advanced Concrete Systems, Inc. All Rights Reserved.